True Bond / Customization Process

From requirement to delivery, in seven stages.

Every project — whether it’s a private-label run of V2 or a from-scratch ODM monitor — moves through these stages. Each stage has a defined deliverable on our side and a decision point on yours.

01
Stage 01 · Typically 1 Week

Requirement Discussion

We map out target market, certification needs, feature priorities, volume range, and timeline. The goal is to understand what success looks like before any quote.

Deliverable from True Bond
Requirement summary document
Cooperation model recommendation
Initial sample timeline estimate
02
Stage 02 · Typically 1–2 Weeks

Product & Engineering Proposal

Detailed engineering plan — base platform, customizations, BOM tier, tooling needs. Quotation, schedule, and a clear definition of what “done” means.

Deliverable from True Bond
Engineering scope document
Itemized quotation
Schedule with milestones
03
Stage 03 · Typically 3–6 Weeks

Prototype / Sample

EVT samples produced and shipped. For ready models with cosmetic changes this is fast. For ODM, it includes ID, mechanical, PCBA, and firmware on the first round.

Deliverable from True Bond
Physical samples (typically 3–10 units)
Sample test report
Bill of materials snapshot
04
Stage 04 · Typically 2–4 Weeks

Testing & Optimization

Reliability, RF, audio, drop, environmental. Your feedback round, our internal QA. Adjustments rolled into a DVT build before any tooling lock.

Deliverable from True Bond
Internal test report
Change list addressing your feedback
DVT samples for sign-off
05
Stage 05 · Typically 2–3 Weeks

Branding & Packaging

Final packaging artwork, manuals, inserts, warranty cards, accessory composition. Sticker placement on the product. Region-specific adapter selection.

Deliverable from True Bond
Approved packaging dielines
Printed pre-production proofs
Final accessory pack list
06
Stage 06 · Lead Time per Quantity

Mass Production

SMT production, final assembly, 100% functional test, packing. PVT pilot run for first orders. Real-time updates from project management.

Deliverable from True Bond
Production status updates
QC reports (IPQC, OQC)
Pre-shipment inspection samples
07
Stage 07 · Per Shipment

Delivery Support

Final inspection, certification documentation handoff, shipping method coordination (sea, air, courier), customs paperwork support.

Deliverable from True Bond
Final inspection report
Certification documents (CE / FCC / RoHS)
Commercial invoice + packing list
Realistic Timelines

How long does this actually take?

Below are the typical end-to-end durations from kickoff to first shipment, by cooperation model.

Ready Models 2–3 weeks
Private Label 4–6 weeks
OEM Customization 8–12 weeks
ODM Development 4–6 months

Ready to begin Stage 01?

Stage 01 is free. Send a short brief and we’ll respond with a summary and the recommended cooperation model.